PropexSpain
Propex Spain
Your Property Experts on the Costa del Sol
Tel-0034 952 933206 or 0034669769794
Building a Villa on Costa del Sol
The  Foundation
DESIGNING AND BUILDING A VILLA IN SPAIN

KEY ELEMENTS IN LAYING A GOOD FOUNDATION
The framework of steel is then filled with certified concrete 50 cm high (depending on design, quality of ground etc).  
Care is taken not to leave any of the steel framework exposed, the stell MUST be covered in all areas by the concrete.

will then form a strong framework which will be filled with certified concrete  (50 cm).  This framework of steel with
continue throughout the structure of the house (via the pillars) up until the roof of the structure.